When the system has two equations (m = 2) and four variables, how many basic solutions are there?

Soru 2:

"A balanced transportation problem has ________ (1) basic variables in its basic feasible solution, whereas the number of the constraint equations is _______ (2)." Fill in the blanks with correct equations.

Soru 3:

How do you describe the concept which is a repetition of a mathematical procedure applied to the result of a previous application?

Soru 4:

Which of the following is not one of the steps of determining the pivotal row?

Soru 5:

What does weak duality property refer to?

Soru 6:

In a transportaion problem, quantities of items to be sent from m locations are a 1 , a 2 , …, a m and to be received from n destinations are b 1 , b 2 , …, b n . In this context, how many basic variables does the balanced transportation problem have in its basic feasible solution?

Soru 7:

In the chart above which points are not feasible?

Soru 8:

I. ⌈1 0 0⌉  II. ⌈0 0 1⌉  III. ⌈1 0 1⌉ |0 1 0|        |0 1 0|          |0 1 0| ⌊ 0 0 1⌋      ⌊1 0 0⌋         ⌊1 0 1⌋ Which one of the matrices above is the identity matrix ?

Soru 9:

What is the process of choosing the most appropriate one of the alternatives?

Soru 10:

"The _________ interchanges costs and constraints of the primal model, and converts the objective from maximization to minimization." Fill in the blank with the correct concept.

Soru 11:

A ------ variable represents the remainder of an expendable resource and applies to less than or equal constraints. On the other hand, a ------- represents the excess amount of a restricted resource and applies to greater than or equal constraints. Which of the followings are complete the gaps, in the sentence above, with the correct order?

Soru 12:

What is the pivot number in the tableau above?

Soru 13:

Decision making under limited time Decision making under certainty Decision making under uncertainty Decision making under risks

Soru 14:

What is the value at the intersection of the pivotal column and row called?

Soru 15:

"In the game of Rock-PaperScissors, if a player would choose to only play Rock for each interdependent trial,regardless of the other player’s strategy." Which notion is about the given example?

Soru 16:

Which game below is also known as The Game of Chicken which is an example of conflict for two players in the game theory?

Soru 17:

1. Iteration  2. Test for optimality  3. Inıtialization  If there isn't a better CPF solution in a simplex method which steps are taken respectively?

Soru 18:

Which term completes the blank in the following sentence best? A ........... shows the gains and losses that result from a combination of players’ strategy choices.

Soru 19:

For the given cost matrix, how much is the total transportation cost calculated by Least-cost Method solution? (all costs in Turkish liras)

Soru 20:

Which of the following is NOT an example of an stochastic process?