When the system has two equations (m = 2) and four variables, how many basic solutions are there?

Soru 2

Orta Zorluk

"A balanced transportation problem has ________ (1) basic variables in its basic feasible solution, whereas the number of the constraint equations is _______ (2)." Fill in the blanks with correct equations.

Soru 3

Orta Zorluk

How do you describe the concept which is a repetition of a mathematical procedure applied to the result of a previous application?

Soru 4

Orta Zorluk

Which of the following is not one of the steps of determining the pivotal row?

Soru 5

Orta Zorluk

What does weak duality property refer to?

Soru 6

Orta Zorluk

In a transportaion problem, quantities of items to be sent from m locations are a 1 , a 2 , …, a m and to be received from n destinations are b 1 , b 2 , …, b n . In this context, how many basic variables does the balanced transportation problem have in its basic feasible solution?

Soru 7

Orta Zorluk

In the chart above which points are not feasible?

Soru 8

Orta Zorluk

I. ⌈1 0 0⌉  II. ⌈0 0 1⌉  III. ⌈1 0 1⌉ |0 1 0|        |0 1 0|          |0 1 0| ⌊ 0 0 1⌋      ⌊1 0 0⌋         ⌊1 0 1⌋ Which one of the matrices above is the identity matrix ?

Soru 9

Orta Zorluk

What is the process of choosing the most appropriate one of the alternatives?

Soru 10

Orta Zorluk

"The _________ interchanges costs and constraints of the primal model, and converts the objective from maximization to minimization." Fill in the blank with the correct concept.

Soru 11

Orta Zorluk

A ------ variable represents the remainder of an expendable resource and applies to less than or equal constraints. On the other hand, a ------- represents the excess amount of a restricted resource and applies to greater than or equal constraints. Which of the followings are complete the gaps, in the sentence above, with the correct order?

Soru 12

Orta Zorluk

What is the pivot number in the tableau above?

Soru 13

Orta Zorluk

Decision making under limited time Decision making under certainty Decision making under uncertainty Decision making under risks

Soru 14

Orta Zorluk

What is the value at the intersection of the pivotal column and row called?

Soru 15

Orta Zorluk

"In the game of Rock-PaperScissors, if a player would choose to only play Rock for each interdependent trial,regardless of the other player’s strategy." Which notion is about the given example?

Soru 16

Orta Zorluk

Which game below is also known as The Game of Chicken which is an example of conflict for two players in the game theory?

Soru 17

Orta Zorluk

1. Iteration  2. Test for optimality  3. Inıtialization  If there isn't a better CPF solution in a simplex method which steps are taken respectively?

Soru 18

Orta Zorluk

Which term completes the blank in the following sentence best? A ........... shows the gains and losses that result from a combination of players’ strategy choices.

Soru 19

Orta Zorluk

For the given cost matrix, how much is the total transportation cost calculated by Least-cost Method solution? (all costs in Turkish liras)

Soru 20

Orta Zorluk

Which of the following is NOT an example of an stochastic process?